Carbon steel pipe work

Carbon Steel pipework fabricated and installed for the OPA, Working with a principal contractor,We undertook fabrications onsite to suit orginal pipe work which had been modified to come in line with current requirements. All of the carbon pipe work was fabricated and tested to Asme ix b31.3, 3rd part ndt inpsection included 10% xray, Viusal inpsection and pressure testing to 32 bar